top of page

SHIMADA
MULTI-SPINDLE CNC LATHES:

The Latest Solutions for Total Productivity from Shimada-Japan's Leading Multi-Spindle Specialist

  • After designing and producing Asia’s first 6 spindle Automatic, Shimada has become Japan’s leading manufacturer of cam-less CNC 6 & 8 Spindle Automatics and 2-Spindle Indexers.

  • The Automatics can be configured with up to two CNC slides, bar-loaders capable of feeding up to 32mm stock, and numerous optional and customized features which can further reduce the cycle times of so many of today’s large quantity runs.

  • By combining the accuracy of CNC and the ease of the cam-less operation, part set-up can usually be accomplished in less than three hours.

  • The 2-Spindle Indexer offers the “load while machining” capability on a CNC lathe with 10” chucks, a geared headstock, and a robust, milling optional, twelve station turret.

2SI SERIES:

shimada-2SI 6 CNC 2 spindle indexer -reload while machining

2SI-6, 2SI-8 & 2SI-10

The 2SI Series uniquely connects two spindles, one turret, and a Fanuc controller into a highly productive, cost effective machine tool package. 

Each model provides an easily customized machining platform which combines the advantages of multiple spindle productivit with the accuracy, flexibility and the simple set-up routines of a CNC lathe.

The Shimada 2SI-6 / 2SI-8 / 2SI-10 2-Spindle 1NC Lathe was developed from the architecture of “reducing idle time to the utmost limit."

  • Collet chuck, 6", 8", 10", 12" chucks

  • Loading with one spindle while processing with the other. Chip to Chip time “2 seconds.” Spindle index time “0.9 seconds.”

  • This design, with the chucking position outside the machine, leads to easy manual loading/unloading and chuck exchange

  • Simultaneous processing of the front and back side of workpieces with one machine

 

This lathe is optimal for the following types of work:

  • Tasks that need a short cycle time and a long loading time

  • Tasks with a short cycle time (work with a large loading time to cycle time ratio)

  • Tasks with a big difference between the 1st and 2nd process cycle times

  • Tasks that requires a large amount of time for chucking under manual loading condition

bottom of page